Cases

Results in practice

A selection of programmes in data, analytics, AI and operational excellence, with the result in numbers.

International organisation · AI

BI reports from an AI prompt instead of manual work

Challenge

Recurring BI reports were built by hand. That took analysts a lot of time, and structure and quality varied from report to report.

Approach

Set up a standardised AI prompt that produces the report with fixed KPIs and a fixed structure, within the guardrails for responsible AI use. Analysts check and refine the result rather than building it from scratch.

Manual → AIrecurring BI reports with a consistent structure and quality

Solmax · manufacturing

€15M less inventory through supply chain analytics

Challenge

A global manufacturer with many sites lacked a consistent view of demand, supply and inventory. Stock decisions were made locally and on instinct, tying up a lot of capital.

Approach

Built demand and supply chain analytics on one reliable data foundation, with clear inventory and coverage KPIs that were used directly in stock decisions.

€15Mless inventory within 18 months

Solmax · manufacturing

Five ERP systems, one source of truth

Challenge

Reporting came from five different ERP systems. Regions and functions used their own definitions, and figures were hard to compare.

Approach

Set up one governed enterprise data warehouse on Snowflake and dbt, with Tableau and Power BI as the reporting layer. Also introduced data governance with clear ownership, standards and quality controls, and data literacy and self-service analytics rolled out widely.

5 → 1source of truth

TenCate Grass · manufacturing

Running production on daily data

Challenge

Data on output, availability and quality of the production lines was not available daily, which made it hard to see improvement potential and set priorities.

Approach

Built a Power BI environment from the ground up, with automated dashboards for OEE, sales, inventory ageing, service quality, maintenance and P&L.

30%less waste in the yarn factory

Unilever · FMCG

Lean Six Sigma at the European production site

Challenge

Material waste in production was structurally too high, without clear root causes.

Approach

A Lean Six Sigma Black Belt project using DMAIC: measure, prove root causes with data, improve and embed the result in the daily process.

9%less material waste

Let's talk

Would you like to exchange ideas on data, analytics, AI or FP&A? I would be glad to connect.